Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do you think they do earthing or grounding in ships and
aeroplanes?

Answer Posted / shailesh

THE BODY OF Ship/Aircraft acts as earth.

Is This Answer Correct ?    21 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

There are Two questions about Steam Turbine Generator... What is HRSG bypass of LP, HP used for in power generation? In particualar, in the event that fault of HP bypass, there would be STG TRIP in operation but none on the LP bypass fault...what's the reason ?

2261


for 100 HP Induction motor service factor is 1.2(SF) we placed a VFD at the motor side load is balance with 0.3 Amp's Phase to Phase but at incoming of VFD load is un-balance with 10 to 20 Amp's what will be cause of load un balance

1895


What id difference between power and energy?

1254


why sometime we get electrical shock while touching the ballon of dish tv connection ? which we should not get.

1939


What do you mean by screen of power cables?

1715


what r PID controllers?why they r used?what is there purpose?plz Explain in detail

2028


how can i use REF and diffrencial relay both in 1 CT core for transformer protection?

1819


how to calculate transformer load?

2412


How do we calculate the Out put voltage of generator, after the excitation is being given?

1882


will 1050kva DG set withstand for back charge of 16MVA transformer

1800


why we are not giving the zone 1 trip command to the master trip relay

1684


Define non-touching loop.

1268


What are the specifications for getting approval of Substation?

1871


what do you mean by plant earthing system.

2000


diameter of cable and core is doubled then the value of capacitance is

4238