3. Assume a building having three floor and a lift,
the lift has the following buttons:
a. G (for ground floor)
b. 1 (for first floor)
c. 2 (for the second floor)
d. 3 (for the 3rd floor)
e. Stop (Stop button to stop the lift in emergency)
Assume currently the lift is in the ground
floor; write an algorithm for the lift to work.

Answer Posted / ravji manji sorathia & co

sir please send the quotation of 3rd floor of lift in my
email id kmsorathia@yahoo.co.in

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

The telecommunications offered by the GSM PLMN may be divided into three main groups.what is it?

2613


how many steel rod of the cilling 10'x10'

2170


how to know low voltage and high voltage ranges for electrical machinery ?

2317


what so you want to work?

1964


How CPU handle an interrupt operations?

1120






Hi i am going to attend Deputy Architect interview in Telecommunication Dept. through UPSC I dont know the type of questions they will ask. I will be very thankful if anyone could help me. Please send to my email-id ganesh_dev@rediffmail.com Please any one have experience of some other Dept., please reply me. my interview in on 10th of Nov. only 5 days left. please help.

5777


What details do you notice about the way this building is constructed? How does it differ from your own home?

2322


what is the rate of 4000sqft rate, with material tile plumbing all work with plinth? Pl. Send ans. Yourlifeme@indiatimes.com

2488


what is the KVAR and how to measure it ?

2340


One House is being constructed by an Civil Engg. all pillars are as per structure, but north side there should be 4 pillars among two at back side were 6" inside from the border and remaining two comes front were placed 1'6" inside. is it ok as per vaastu, else if i alter the alignment what would be the best idea, kindly help me.

2290


how to measure 4mm,6mm,12mm,18mm plywood into a cubic meter and how many layers in a cubic meter

2867


what are the thump rules of taking BOQ of building construction?nallaPERUMAL 9003858728.

3591


I am architecture student. What type of foundation is preferred in Alluvial soil ? where the soil texture is sandy loam...and also which type of foundation is used for steel structure which will be for 6 story building design

1731


Who can give me Stracher Design for my plan For Coloum Position. Please call me 9921761702

2444


In informatica by using filter tranformation what is the filter condition to display for the single id empno

2136