Answer Posted / l.veeraragavan
due leading power factor, the regulation of tr-line will be
negative.
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.
what is the question paper model for section engineer in RRB
How do you select the pickup value of the relay?
Where burned of electricity,when,who, & why.
WTA used cb?
How to calculate wire length,size & current? ( related to control panel)
if 3400kw slipring motor rotor shorting done and motor started on mv drive ,what will be the rotor shoring current
How REF protects transformer alone? explain with diagram.
What types domain of laplace transforms? What behavior can laplace transform predict how the system work?
What is the role of feedback in a closed loop control system?
I am going to appear for the RRB Chennai Section Engineer online exam. Please send me the question papers from 2001 to date to my mail id:upendrakrishna20@gmail.com,plz send me ,or send any other rrb papers plzzzzzzzzzzzzzzzzzz
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
what are types of encoder
The loads are connected with phase and ground then why current flow as the loads ?
how to operate and maintenance of 1500 kva diesel generator set