Answer Posted / hemant gor
A 615 is a high carbon steel. As you have seen in other posts, A615 IS technically weldable, but A615 is not widely welded because of the procedure requirements to weld it.
Generally A706 is specified for weldable rebar to avoid the AWS welding procedures required for A615 rebar.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is Curtailing of R/F
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How to testing voids of filled aggregate in bitumen mix design
Why was the empire state building made of steel?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
how many material required for brickbat water proofing of toilets.
what are the duties of Site Engineer in work site?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
how i can tak Quantity of mortar in block work
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What applicable rate of wct in bihar
Explain what are the problems one might face while having a Cantilever balcony?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
What is difference between code and standard and specification?