Answer Posted / naseeb ahmeds
for that u have to first know the material which is being
conveyed by the conveyor.
Basic thing is Lump size of material:-- mm
then
1). find out the lump size factor of material
for that refer(IS 11592)
2). then find the Abrassiveness factor of the material
for that refer(IS 11592)
Add both the factor and fin out the belt conveyor speed from
IS table.this is simplest Method.otherwise it is lot of
difficult to find the speed in general.
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
How to shut down and overhaul the centrifugal pumps?
What do you measure in the banana and mountain diagram?
What is the mathed of maintain oxizen level in a air tite A/c room.
How many mechanical engineers work with you at your place of employment?
draw p-v dia distingshing naturally aspirated and supercharged engine with reference to pumping loss?
In Rankine Cycle we use the concept of Tm(mean temperature of heat addition).In actual cycle the efficiency comes as n=1-T2/T1 Taking Tm into consideration it comes as n=1-T2/Tm as T1>Tm so the efficiency for both case will not same for a same cycle. Can anybody explain how it is possible? Advance appreciation for your effort.Thanks
Can an airplane fly without a tail?
describe a type when u anticipated potential problems and development of preventive measure.
Q. what @the interview exact Q&A is it correct
Metals, in general are of low strength and do not possess required physio-chemical and technological properties for a definite purpose. Alloys are therefore more than metals alone. Discuss the arrangement of atoms and structures of alloys.
Enumerate some trouble of fuel injection valve
What should be done to prevent a safety valve to stick to its seat ?
What is the seal packing gland for turbine?
How much of MSW waste is to feed to produce 1MW ?
Causes of M/E high exhaust valve temperature