Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

During he starting up of the motor, the upstream's MCCB
(350A) always trips due to the UVT relay activated.
Can Star-delta starter use for a 20kW Motor (For a powder
mixer machine) cause voltage-dip in the supply line voltage?
If so, what are the recommended solution to
eliminate/reduce the transient voltage dip in the line
voltage?

Answer Posted / piyush rana

You can check the length of the cable from the supply to
motor, I think It will be more so that due to line
resistance loss during starting the line voltage will go
down for the fraction of seconds.
please mention the connected load, transformer capacity,
volatge incoming etc for further clear answer.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why do we have spikes enough to burn electronic boards, when generators are not grounded

1761


what is lrs tank water resistance.

2490


which network topology offers the greatest level of tolerance?

2063


For refrigerators the motor current is raised beyond its rating on both conditions when the voltage of the system is more(say 270v) than the rated voltage(220v) as well as when the voltage of system is less(say 160v) than normal voltageof 220v, why explain?

1926


What are dcs and plc?

1046


Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.

2062


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2770


how we design a pannel to start 10HP motor with the help of star delta starter?

2148


WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.

2647


if main CT is of ratio 50/5, and meter CT is -/5 what will be overall multiplying factor of meter.PT is 11000/110 .

1615


What is current & voltage ? Voltage perform at any load without current or not?

1826


What are the Full Forms of TVM, MTL, CVT ?

1383


how is find out kwh step by step

1736


CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS

1816


What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.

4206