1)What is Suggested type of cement for concreting at water,
for mass concreting and where the chaces of gettin attucked
by salt?
2)How many types of camber?
3)why we always preffer short column in case of residential
building?
4) Is there any advantages between the use of One way slab
& two way slab?
5)What shoul be the % of steel for R. C. C. perpose based
on volume & area ?
Answer Posted / baba lalin
3)in short column, Bending will be small.. it takes more
time to buckle
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How to calculate paint drums per meter square
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
List out some of the checking’s, done at the completion of construction?
why do we not deduct volume of steel to find actual volume of concrete in practical???
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What Are The Different Type Of Slump Test Indications?
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
what is cement wastage percentage in NHAI ROAD WORKS
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??