Answer Posted / shafi kukkad
for controling we need continue supply in any condition
so,in Electrical Storage only by Using Battery which input
and output is DC. so whn our normal system fail this DC
comes from direct from Battery bank (which chareged by DC
UPS.) no any other arragment required.
if we using AC Controling we used AC UPS syestem, which
done first AC to DC and charged Battery. and whn Fail
normal control supply (which is AC), thn first Battery
output DC convert into AC and give control supply.which is
not reliable and complex arragement.
| Is This Answer Correct ? | 8 Yes | 6 No |
Post New Answer View All Answers
placement paper samples of mspl company
1600 KVA ka transformer hi aghar lt side par 800A aur voltage 420 ho to HT side ki cable ki rating keya ho gi?
Explain forward resistance, static resistance and dynamic resistance of a pn junction diode.
what is earth-fault?when it occurs? to check where it occurs what type of test should we do?
What is inrush current?
In Air circuit breaker LSIG protection unit is used. Without fault in cables (2 runs 3Cx150Sq.mm Copper, 1Kv grade, XPLE armored cable IR value is more than 550Mohm @ 500V Megger) and load section Long time Overcurrent protection is triggers and trips the unit. We changed LSIG protection with new factory tested unit. Even then fault is persisting. Please suggest the possible causes
how can calculate 1kva generator running time in 1 liter keroscene
Explain how you intend to work under pressure to meet up with deadline target?
What is icu and ics in Acb and how many time icu or ics passes from breaker?
Define end float in a motor?
HOW TO CALCULATE S/C,O/C,E/F OF ACB.
Do inductive loads have distorted current waveforms ?
A logic circuit that provides a HIGH output if one input or the other input, but not both, is HIGH, is a(n)?
Classify driling machines.
how to changeover ups in this power failur time?