Answer Posted / abdul nazir
Answer no#2 Are u crazy, where will you represent the
voltage in MVA?
| Is This Answer Correct ? | 12 Yes | 6 No |
Post New Answer View All Answers
what is the function of bearing in dc mchine" and where it is placed
how to calculate the earth mat design in 132 kv substation yard ????
Can you used moeller lzm1 mccb in a dc system with 125vdc and 20ka short circuit current , beside is it have 24 or 48 volt shunt ? Beside how long current can through from An MCB shunt contacts? (like Z7-AS 24 V)?
what is the electrical?
why high speed tripping relay will be used in tripping circuit why not normal relay
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
What is referred to the electron in the outer orbit?
In electrical locomotive engines, the DC series motors is being used as traction motor. But in new engines like in WAP7 & WAG9 the 3-phase squiral cage induction motors has replaced them. So can someone tell me the advantages of induction motor over dc seris motor in engines points of view....???
how to calulate short circuit current for the following: 1.cable connecting 11KV of 22KV/11KV transformer to 11Kv of 11KV/415V transformer 2.what cable size should i use.
what is auto re-closer?
what are the breakdown voltage rating of mini- curcuit'transfarmer!
Why line VTG = √3 phase VTG in star? How?
in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?
what is the excess air in furnace
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.