Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the function of buchhos rely in transformer

Answer Posted / kjh

I agree with answer #2 .I want to add some, B-relay has two
stages one is connected in alarm circuit and the other is
connected wtih tripping circuit.It also tripping the
incomming C.B. of the transformer in case sewear fault.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In India the supply voltage is 230 volt A.C. During the negative half cycle phase becomes neutral and neutral become phase? or what will happen during negative half cycle? how the electrons flow during positive and negative half cycle?

2086


Rules and standards of electrical control wiring ?

1223


63MVA,220KV/6.9KV Transformer LV side neutral is connected to Earth pit through NGR. Whether this earth pit required to connect with near by below grouding earth mat or it is to be kept separate?

2799


Proviiding the Dedicated N earth and individual Body Earths ,Finally these all looped /Now my Question :- will it not harm in case of Transformer Fault current flows in Dediacted N Earthing to Looped Body Earthing.

2256


WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?

2032


How to calculate the heat load for a electrical room

3143


Why Ac Systems Are Preferred Over Dc Systems?

1357


Keywords: Die, Card, Coin, B/N 2 To 12

1328


why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.

2205


If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.

2397


The size and construction of bushings in a transformer depend upon?

1831


what is the usage of microcontroller in the panel board?

2138


Details about Flux Compensated magnetic Amplifer starter for motors

2062


how do i work out the Amps of a incommer if i am running 1 37 KW motor and a 0,75 KW motor and some solinoids

1946


How can eliminate noise problem inside temperature controller temp. variation due to contactor chattering problem.

1667