How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
how to nfind out the specific gravity of sand.aggregate,water please help...
What Reinforcements Are Used In The Process Of Prestressing?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Why should you show Client/Engineer activities clearly on the project plan?
What is the difference between shear and tensile strength?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
what are the challenges of being a team leader and a supervisor?
explain what do you mean by the property development.
What is the difference between linear dimension and aligned dimension?
how much cement sand n bricks required in im3?and how much in plaster?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.