Between Star-Delta & Star-Star Power transformer which one
is efficent for Earth Fault?
Answer Posted / daher
star/star because in the case of line to earth faults the
zero curret IO in delta connection transformer has no path
to leave the close loop of three phases transformer
| Is This Answer Correct ? | 17 Yes | 8 No |
Post New Answer View All Answers
Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??
Why we find the sensitivity for the CT's to check?
where the lexical paramater will use in fron end?
The Howland current source produces a A Unidirectional floating load current B Bidirectional single-ended load current C Unidirectional single-ended load current D Bidirectional floating load current
List out the different frequency domain specifications?
how test transfomer(3 phase75kva) by megger
What will happen if the d.c. Machine is operated below rated speed?
A 500 V shunt motor runs at its normal speed of 250rpm when the armature current is 200A. The resistance of the armature is 0.12 Ω. Calculate the speed when a resistance is inserted in the field reducing the shunt field to 80% of normal value and the armature current is 100A.
Y phase plates are used in transmission line??? what is there need???
describe the fully control circuit diagram of ac drives
what is effect of length of air gap on performance of dc motor and generator?
What are the applications of different multistage amplifiers?Plz also write advantages of these amplifiers? Thaaaaaaaaanx
After doubling voltage from solar cells & use step down voltage transformer can we get high current output with low voltage.
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
temp of cast resin 1500kva tx formerwent up to 138.c but came down very fast to about 100.c within 20 mins when load was reduced from 70% to 60%