for 12KW motor which cable size has to select for ex.10
meter.
Answer Posted / prodip das
1. we have to select cable
for that first calculate current=12X1000/1.73x400x.95
=19 Amps
Type of cables= single core NYY(Red/Yellow/Blue/Green)
Cable size3x1CNYY
NYY 2.5 sq.mm
(ccc)=19.61A
Group rating=.68
sand bed=.90
Rating factor=.68x.90=.61
Actual CCC OF 2.5SQ.MM CABLE
=19.6X.61=11.96A
=26.20x.61=15.98
=33.63x.61=20.5143(OK)6 sq.mm
Votlage drop as per IEE regulation
Distance=10m(more)
=5.9x10x.152=8.968V(ok)
Finally SWG=6sq.mm
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
What is 11 N1 and 12 N2 in single phase Transformer ?
What is the formula formula for Busbar sizing and what are the things to be consider for Busbar Calculation?
difference between power surge and switching transient
What is meant by positive and negative feedback?
Why synchronous motor is used in power factor improvement,dc series in lift
What is the difference between electrical earthing and electrical grounding?
Is it possible to measure the voltage of a battery from a single terminal?
66kv under ground cable how to layaing in ground any special case two ckt r runing
List out the different frequency domain specifications?
Define early construction of human being
explain types of electric welding and its applications
what is JE exam?
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
How can calculate the earthing strip of Copper/GI for rating of 30kV,discharge current 10KA Lightning arrester.
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.