Answer Posted / leela
We use BPM for:
1.Spliting the messages
2.Merging the messages
3.For multicasting
4.Transforamtion
5.Control/monitor
6.Send an alert.
| Is This Answer Correct ? | 21 Yes | 34 No |
Post New Answer View All Answers
When we use proxy and when we use for idoc?
What is EDI?difference between EDI & ALE IDOC?
What is the parameter to be changed to increase lock table size in SAP?
What is lock management in sap system? Explain.
With sap user interface how many screen elements can be used
What is Universal Worklist UWL?
what are the integrations in netweaver?
What is the difference between call transaction and session?
How do you connect to SAP NetWeaver Backend system?
Why do we take receiver side idoc adapter?
What are the post installation steps for SAP NetWeaver installation?
Idoc to file scenario step by step?
Wt is the diff bw BPEngine and Integration engine?
Explain SAP NetWeaver Process Integration application?
What is an instance? How many types of instances are there? Explain them.