Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is C.T, why it is used and what care should be taken
for that while connecting?

Answer Posted / piyush rana

CT means Current Transformer, It is used to measure the
higher value current flowing through the circuit.
CT should be connected in such a way that the current
should enter from the P1(primary) & leave from P2, Also on
secodary side S1 & S2 should be connected with correct
sequency other wise the meter will not sense the current,
While CT is not in use, we should short the S1 & S2
(Secondary) of the CT to avoid saturation of the CT.
If the seconday of loaded CT will be kept open it will get
saturated & burst.

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

a 100mva,400/200v transformer has leakage impdce of 10% draws a steady state line currentof---------------

1983


what is the importance of Partial Dischage test for Electrical Equipments

1978


induction 3 phase motor terminal connection

2746


which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?

2081


Draw the circuit of clapp oscillator?

1191


In siemens PLC, why do we want to move the data ?

2375


In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????

2191


what is distribution board?

2357


What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.

2739


how much excitation voltage required to generate 1mw power?

2103


What is the Current equation in series RLC circuits.

1110


why the projects getting loss?

1988


How to do stting of vl250 siemens MCCB

3003


What is Meter MF if External CT Ratio is 150/1 , PT Ratio is 132/110 Meter CT Ratio is 200/1 & Meter PT Ratio is 110/1

1960


briefly explain the main blocks found in a microprocessor based system

2249