what are the main parts of UPS what is the function of that?

Answer Posted / arun reddy l.

Hi this is Arun Reddy. UPS means Uniterrupted power supply.
The main parts are Converter,Inverter,Batteries,Rectifier.
Converter: It converts AC to DC Supply. The DC supply goes
to battery to charge.
Inverter: It converts DC to AC Supply.
Battery: It takes DC power means output of Converter & We
get DC power output from Batt. When the power comes to
Inverter it will become AC power.
Rectifier: It converts AC to DC Supply. It used Before the
Batteries in UPS System.

Thanking You.

Is This Answer Correct ?    97 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Control & Relay Panel? And Remote Control Center?

1751


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers

2306


How many capacitors using in LT panel as per Govt rules?

1510


How much ph is maintained of water resistance starter for slipring induction motor ?

1979


why impedance relay is used for medium transmission line protection

1818






Please give me a erda placement paper

1300


How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?

1765


The inventer is a battery, but if lost current at home u will turn on the fan but the is AC and inventer battery is dc . Then how the fan was rotating. What device Or machine in fan converst the Dc power to Ac power

612


diameter of cable and core is doubled then the value of capacitance is

3702


Is it advantages of having star-delta vfd than normal star vfd , if yes why?

1776


Why transformer used in UPS??

1038


WHY EXCITER PHASE SEQUENCE ARE OPPOSITE THAN STATOR SUPPLY PHASE SEQUENCE IN SYNCHRONOUS MOTOR >

1447


sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

1790


hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com

1316


errection check list for transformer maintenance

2185