Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

electrical engineering giving priority for insulators
rather than conductors, why ?

Answer Posted / swetha

Selection of Insulation of conductor is depend on
Safety ,reliability,location where it is used.So electrical
engineer give more priority to the insulator then a
conductor

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the specifications for conducting earth leakage test as per IEC standard?

1995


How many types of oil using in H/T & L/T Oil Circuit Breakers. need Explenation ?

2823


What are diffrent type of road taxes?

1922


How to calculate the time setting for star connection in star delta starter? For example 10KW 3PH Induction motor.

2576


What are the properties of a resistor?

1046


Different types of relay fault which phase sequence??

853


how does a submersible pump work..?

1823


how to measure earth resistance of a substation

3263


2 v/500amp/hr to 1.80vpc at 20 degree celsious 2v/5ooamp/hr to 1.75 vpc at 77degree farren .this is the capacity of a battery .what is the meaning of this . can i get a detailed explenation

2247


why impedance relay is used for medium transmission line protection

2254


Explain how to determine capacitor tolerance codes?

1122


in the directional overcurrent and earthfault protection,normally we are setting the angle 45 deg lead for phase fault overcurrent and -45 deg lead for earthfault fro forward direction.but both the fault are operating on the same angle region only.why?how the relay will response?

1786


-How do you select cable size for a given load at a given distance from source of supply. How do you find voltage drop.

1746


what is control supply rating of a machine

1920


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739