How to find quantity of cement mortar?
I want to know the req quantity of cement for plastering 300
sft in final coat with 12 mm. Any math involved? Plz help
Answer Posted / babar vikram
volume=300*(12/300) ft3
=12 ft3
| Is This Answer Correct ? | 10 Yes | 63 No |
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
1m square 20mm plastering how much of water need curing work
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
Which IS Code/American Code applied for coupler test of steel
What is meant by Crystal Concrete?
List out some of the common problems that architect have to tackle it?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What do you mean by honeycomb in concrete?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.