Answer Posted / raffi
Calibration procedure:
calibration equipment: calibrator with handpump
For ex: Range of Transmitter is 0-100psi
Step1: connect the calibrator to the transmitter
Step2: connect the multimeter in series with transmitter to
verify the transmitter o/p in mA
step2: Apply the pressure to the transmitter by hand pump
in calibrator
Step3: compare whether both calibrator and the transmitter
showing the same value.if you applied 50 psi throuhg the
calibrator then the transmitter should have to show the
same value.If you find any error.Do the zero/span
Adjustment.by adjusting the zero/span screw
increasing/decreasing
step4: compare the transmitter and calibrator as per follows
calibrator Transmitter Transmitter o/p
in psi in psi in mA
0 0 4
25 25 8
50 50 12
75 75 16
100 100 20
| Is This Answer Correct ? | 22 Yes | 0 No |
Post New Answer View All Answers
how u calibrate pneumatic n motorized c/v?
Explain the mechanism behind the turbine meter.
pls give me presant awerness quistion and answer in my emailid.
How flow can be measured with dp?
in which principle pressure tx,level tx ,flow tx,temp tx ,control valve works?
how to check earthing,what is minum ohms for proper earthing
how many pulses are required by a ac induction servo motor of 4 poles with 50 Hz frequency to rotate by 1 degree?
how can i calibrate the temperatuture gauge used by temperature bath(dry block) i mean step by step procedure?
How you calibrate absolute pressure with the calibration range of 0 to 1000 0C Absolute. Please explain the procedure for calibration.
What is defferent betwen ESP &PCP PUMP .HOW IT IS WORK?
Drum level tx with GP4 with zero elevation:7300mmh20 on HP and 8050mmh2o on LP as range but on commissioning the tx readiing is max,Why this reading?
all questions related to instrument technician in any offshore oil and gas company.
What is the function of solenoid valve in on/off & shutdown valve and why it is not used in control valve normally?
In VVVF DRIVES VOLTAGE IS ALSO VARY WITH THE FREQUENCY. HOW? WHAT IS THE DIRECT FORMULA RELATING THESE TWO.
what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?