hi all
When I try to assign plant to company code,it shows an
error: Valuation area missing in T001W SAVE AGAIN. I tried
all the possible ways. ..
how to solve this error
Answer Posted / mkk
First check whether the plant is defined and saved. The only
reason for the above error is that the plant which you are
going to assign is not defined in the system.
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
What is vendor evaluation and how do you maintain it?
Why gr blocked stock is necessary in sap mm?
Why do you need 'material types' in mm?
What is the difference between a blanket purchase order and the framework order?
What do you mean by consignment stock?
What is an 'mrp list'?
With which modules in sap is the inventory management integrated?
What do you mean by subcontracting?
What is the source list?
What information is available in the 'accounting view' of a 'material master'?
What is sub-contracting cycle in mm?
How to create tax calculation procedure in mm?
Can we create pr with reference to another purchase order?
What is use of material type unbw?
What is the result of goods movement?