11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?
Answer Posted / mubanga mulenga
You need:
1)Inst., o/c, Metering & EF - 3 CT's
2) REF - 1 CT
3)SBEF - 1 CT
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
for 750 kw LT load what will be the ht kva
How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?
what is the step by step formula for calculating bus bar phase and neutral size of a panel board.suppose the incomer of panel board is 100A..???step by step answer please
Advantages of using generator circuit breaker (GCB) scheme in a power station ?
Block diagram of Power line communication?
What is kvar?
what irequirment need to be followed when working on live equipment
What are the advantages and disadvantages of the ac motors?
i need the details about bhel exam.how to apply for that.please send to my email-id.thenmozhi2k7@gmail.com
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?
H.t motor 6600 volt to same motor lt supply 440volt supply applyed to h.t motor to effect....
what is the reqirred voltage in HT motor to get full RPM on no load test?
why the carbon brushes are broken in srim while the motor runningtime
what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)
What is Annunciation?