11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?
Answer Posted / mubanga mulenga
You need:
1)Inst., o/c, Metering & EF - 3 CT's
2) REF - 1 CT
3)SBEF - 1 CT
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define noise?
what is frequency response?
what is the value of combined earthing in general electrical circiut?
What is block diagram?
My load is 1635 KW. & current pf is 0.884, I have to improve it for 0.99.Please suggest what KVAR value is needed?
How to measure the earth resistance value in a concrete pavement(flood light area)?
i want wipro vlsi placement pattern please send me
what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?
Thermal withstand capability under full short circuit conditions, in terms of number of times of occurrence of short circuit and corresponding anticipated percentage reduction in transformer life.
How we calculate the current carrying capacity of H.T. cabel?
what is effect of leading power facter on the system and billing
What is difference is of VSD,VFD,VSDS, are they the same as the direct current to control dc using above mention
how maney type tempereture measurement ?
when we decide to use soft starter drive or vfd drive in mcc to operate apump?
What are the weight of 800KV DA,DB and DC type tower ?