Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is consumption based planning?

Answer Posted / riyaj

as i no,

as per the consumption of the material by the consumers
the production will be done at the planet



* more answers welcome

Is This Answer Correct ?    3 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When the system checks availability which scheduling would it use first?

1046


Bom usage when we create a bom through cs01, what effect does bom usage field have on subsequent configuration? For example, if we take it as 1=production or 5=sales what effect will it have on subsequent processes?

1164


What is a partner type? Give some example?

1020


What is sap sales and distribution?

1058


What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling

814


What is the function of Profit center in Material master and how will system react when it finds Profit center in MM/when it does not find Profit center in MM? Plz answer for both the scenarios?

2200


Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?

1135


What is the path to define condition type in sap for pricing?

1052


What is the difference between connected & unconnected lookup?

1040


Can you assign two different sales organization to the same company code?

1001


How is the shipping point determined?

1056


A is your client; b is your client’s customer. B need x material, but x material is now out of stock, then you can solve this problem?

972


PRICING…… I have a requirement where I have a fright condition which is a header condition for the whole document, I will be maintaining the fright condition recorder (header level) because it’s header condition, now the requirement is if I want to have 5 conditions to be calculated for each item because let’s say I have 5 line items, I want to see how the side calculated first of each item so what’s the best way to take out that out of the system in standard configuration, how can we achieve this?..... REPEATING question (I have a fright condition, now fright condition is a header condition, now my requirement is I wanted to applied that fright condition each line item level so fright condition applies a header level but my requirement is I want to see each and every line item should also get this fright condition on the value of the item, let’s say my fright is $100 so I have 5 line item, each item has the 10 10 10… so build on that value I want to purpurnate the fright condition, how can we achieve this from the standard system configuration stand point?

940


At present we have the STATIC credit check, for only one customer we want DYNAMIC credit check from next month. no need to go for configuration ? only should go for master data for that only customer.

1550


Sir, I'Ve interview with IBM . I want few SAP-SD real time tickets and its solution . ... E-Mail New Answers Answer Selected Questions Post New SD Question ...

2803