Answer Posted / pati
Repetitive manufacturing is for contineous products
manufacturing like cement, Iron & steel manufacturing.
No frequent changes in Routing.
Back flushing cab be done. i.e Automatic posting of good
issue and Gr
Less aless of posting and manual interference
The production will be continued for a period of time with
out any changes in the process.
No need of lot siges very frequently
Costin of material is done by Cost controller.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
Mention what is the production process in sap?
What is alternative BOM, or diff between BOM group and Group BOM?
What is a ‘work center’ in pp?
What is purpose of schedule margin key?
what do you mean by planning time fence
How mrp (material requirement planning) types are classified?
What is the internal recruitment?
What happens to planned after it has been converted into production order ?
What general data appears on basic data screen?
Explain service level agreements
What is processing class, where we do them and why?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What are traffic lights in mrp?
Can we create production order without bom and routing ?