Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is advantage of repetative manufacturing ?

Answer Posted / pati

Repetitive manufacturing is for contineous products
manufacturing like cement, Iron & steel manufacturing.
No frequent changes in Routing.
Back flushing cab be done. i.e Automatic posting of good
issue and Gr
Less aless of posting and manual interference
The production will be continued for a period of time with
out any changes in the process.
No need of lot siges very frequently
Costin of material is done by Cost controller.

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4834


Mention what is the production process in sap?

1069


What is alternative BOM, or diff between BOM group and Group BOM?

1659


What is a ‘work center’ in pp?

1052


What is purpose of schedule margin key?

1215


what do you mean by planning time fence

1046


How mrp (material requirement planning) types are classified?

1041


What is the internal recruitment?

1069


What happens to planned after it has been converted into production order ?

1078


What general data appears on basic data screen?

1166


Explain service level agreements

1100


What is processing class, where we do them and why?

1100


Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.

2026


What are traffic lights in mrp?

1281


Can we create production order without bom and routing ?

1151