HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / ashok subrahmanya
As per the drawings of cast insitu concrete(depending upon
weather its PT slab or rcc slab) we have 2 calculate the
pour area say A1.Now
Quantity of concrete per pour=
(A1*slab depth)+(Drop panel area*Extra depth of drop panel)+
(No of beams*Its c/s area*extra depth)
| Is This Answer Correct ? | 22 Yes | 6 No |
Post New Answer View All Answers
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
What should be the standard roof height like to be?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
Define What materials were used to build the Golden Gate Bridge?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
For Wet Mix Mecadam design what is Optimum moisture content
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What is the difference between one-way slab and two-way slab?