Answer Posted / bimal
Transformer testing is mainly done to know the correctness
of wdg,core, etc.....
The Lv tests are.
Vector Group,Magnetic Balance,Magnetizing Current,Ratio,
Hv test are.
Impulse test,switching,etc.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.
explain the functions of main isolation switches
How to calculate MCB Breaking capacity.
Which capacitor is preferred for high voltage and frequency?
What shall be the secondary output voltage if the primary winding of a 220/6V, 50 Hz transformer is energized by an 110V, 60 Hz supply?
how many joints are allowed in underground HT cable of 1 KM
what is meant by motor startup supervision & motor load jam protection ?
The size and construction of bushings in a transformer depend upon?
Where can I get Iidian straderd specifications for electrical items or works in web? please help me.
Damping resistor provided in open delta (tartiary) winding of a measuring PT at the incoming of a MV inverter drive panel is getting heated up. Can any body explain the reasons and suggest the remedy?
Details about Flux Compensated magnetic Amplifer starter for motors
A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.
What do you mean by an instrument transformer?
What types of question are done for diploma students in aptitude test
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)