why is the vector group analysis done in transformer tests
Answer Posted / joe callaghan
Transformer vector relationship is tested by shorting the
primary A phase to secondary A phase, then applyying a
three phase voltage to the primary side of the transformer.
Voltage measurements are then taken as follows:
A-B
B-C
C-A
B-b
C-b
B-c
C-c
These values will then allow you to draw the vector diagram
of the transformer.
| Is This Answer Correct ? | 32 Yes | 9 No |
Post New Answer View All Answers
which type of effect of turbine and generator reverse power protection ?
When the relative speed between the magnetic fields of stator and rotor does is zero under steady state operation?
Why front mounted CT polarities are always towards breaker?
explain the Trip supervision circuit
What are root loci?
Load break swicth maintenance procedure.
Why auxiliary transformers are not connected in parallel in primary stations?
two phases with neutral supply can be taken in 3C X 10 sq.mm cable .
Why reactors use before incoming of ac vvfd drive?
WHAT WOULD BE THE FORMULA OF WIRE GAUGE FOR A FULL LOAD CURRENT
What is the difference between single point and double point bonding. please kindly detail about bonding of cables.
what is the power factor used by the PHCN in nigeria? 2. what is the difference between an alternator and generator. 3. Generation of poweris in KV but how is transmission is in MW. 4.If the transmission of power is 20,000MW how can it be increaesed to 80,000MW
Why field rheostat is kept in minimum position while armature rheostat at maximum position?
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
I want to merge a cable..in between two metering Cubicals which contains CT's and PT's and Energy meter..before taking merger..what are the common things required?