i have an interview in Qatar Petroleum. So please provide
the all details abt fire & gas systems
Answer Posted / welcome4ujd
providing all details here is difficult, i will try to give
some basics.
The Fire and Gas system (FGC) is designed to give the
earliest possible warning and location of:
a) A fire in its initial stage.
b) A flammable gas leakage or accumulation up to the
lower explosive limit (LEL%).
c) Any toxic gas likely to be present up to the
occupational exposure limit (OEL).
the architecture is
Detectors(input)--detector interface module--Fire and gas
control panel--outputinterface module--interface relay --
output devices
Description of the items :
1- The detectors are Manual Call Points, Fire
Detectors or Toxic Gas Detectors.
2- All incoming detector field circuitry interface
with the Fire & Gas control panel (F & GCP) by means of a
detector interface modules.
3- The F&GCP (Fire & Gas control panel) looks at all
of the connected Inputs and acts on the information from
certain number of the inputs that agree. This is commonly
known as a 'voting' system.
4- Output interface modules receive the outputs from
the proccessing unit and provide to the output circuits
(Relays)
5- The Interface relay provides electrical isolation
between the plant and fire &Gas control panel and provide
the output devices with the required power for operation.
6- The output devices are either alarms(
audible /optical) and/or control circuits.
Normally a protected plant is divided into fire areas and
each fire area has its own detection, alarm, control and
extinguishing system (if used).
If both fire and gas detection are required, these systems
share common control panels.
The fire detection and alarm system has manually operated
call points and automatic smoke, heat and flame detectors
located in areas where a fire hazard may exist.
Manual initiation of critical control actions overrides any
software-based system.
A brief description of the types of detectors and output
systems is given on the following pages.
The type of a Fir & Gas control panel and associated
detectors/outputs depends on the type of the controller it
self.
Addressable type system
If the controller is intelligent type, the detectors will
be addressable types, which are individually identified at
the F&GCP via a data highway. If the detector is not
addressable type then it is normally connected through a
dedicated interface module located near to the detector.
The addressable detectors and detector interface modules
respond to regular polls from the control panel and report
its type and status on the same loop (normal, alarm, open
circuit, short circuit...etc.).
Traditional type system
If the controller is traditional type (composed of discreet
electronic modules), the detectors are of the traditional
type, which changes the value of the electrical current in
its loop via normal wiring connections.
Each loop is identified on the F&GCP as a Zone.
The zone could include one or more of the traditional
detectors.
The activated detectors can not be individually identified
on the F&GCP, only they can be identified by observing the
integral LED on their locations.
Is This Answer Correct ? | 42 Yes | 3 No |
Post New Answer View All Answers
a flow transmitter [range-0-400mbar] connected in process line. please explain me how to calibrate the flow transmitter , & how to do static error
What is cut off relay? And why use in PLC and DCS?
How is automatic reference junction compensation carried out in temperature recorders?
What are primary elements of measuring pressure? Which type of pressure can be measured by these elements?
i want formula for flow control.am doing project in flow control using orifice . i know value of the flow level(Q) . upstream(p1) pressure, orifice diameter(Do) , pipe diameter(Di) and oil viscosity(Vi) how can i calculate downstream pressure
Where is wet leg is used?
How can a d.p. Transmitter be calibrated?
How signals can be taken through modbus?
how to calculate orifice sizing? and tell me if pipe size bet 50mm t0 200mm then we can use pipe flange??? and above 250mm pipe size should i use D & D/2 Flange? is it right or wrong?
can anyone guide me how to get any of the previous year GAIL question papers? are they available? 0n 2nd august i have to take the written test.
How to convert mmWc(mili meter water colam) to tph(ton per hour)?
1- Explain about HPM 2- What is the FSC and explain the configuration of FSC 3- explain the complete loop of vibration, how it works (field to control room) 4- What is the use of proxymitter? 5- During job your partner effected with H2S then what you have to do. 6- what type of gland packing uses when valve glind is leaking.
what is vibration a part of proceess variable? if vibration is a part variables then how we minimize the actual vibration on machine on load,? vision of instrumentation contrl plz ans me IPGDL interview question
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.
I faced several time siemens ps2 positioner automatically getting Chang in it's set point direction after auto calibration So is there any causes biside this or any permissives ?