Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?

Answer Posted / senthil kumar

06CT and 03PT'S

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the minimum IR value of HT/ LT cable? Pls post separetely!!!!!

2511


What is the universal motor?

1163


what is the circutor?why we use it ?

2408


during installation time of transformer and alternator which points we have to observed?

2011


Explain how to determine capacitor tolerance codes?

1269


what is DRP panels?

2207


What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.

2034


how to select battery for 15 KVA UPS with formula

2598


Draw a SLD of HT distribution EB grid up to users Transformer?

6252


use of PIR in ehv breaker

2214


Yazaki india pvt ltd interview questions qurey related

1087


low frequency protection why recomend?

2351


if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required

2544


what's producer of XLPE cable laying in undergroung

2191


Explain how you intend to work under pressure to meet up with deadline target?

5271