HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / mazhar abbas
THROUGH IS CODE 456:2000
| Is This Answer Correct ? | 17 Yes | 26 No |
Post New Answer View All Answers
Where is the worlds longest elevator and how long is it?
How to make a c++ program that converts any base to base 10?
For the construction project what capital cost has to be taken in consideration?
how many digree of freedom in four bar chain
If specific gravity of cement is less than 3.15 what is the cause?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is Bearing Capacity,How to determine it?
what does the grad of cement shows (denotes)?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
density of crush sand & crush stone or grit powder
What are the RISKS during the project construction?
What is meant by autocad?