Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Whats meant by trivector meter where it is connected at the
substation?

Answer Posted / venkat iyer

Tri-energies are Apparent, Active and Reactive. These are
expressed in three vectors. A single meter that measures
these three energy details are called a Tri-vector meter.
This is clear from the name of the instrument itself.

Is This Answer Correct ?    94 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the suitable transmission voltage?

1117


what are the differant std sizes of cable trenches?

2149


electrical ques

2187


if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.

1810


i am completed diploma in ece,and working in ht and lt lines.so is elligible diploma in ece for get electrical C Licence?plse give ur opinion?

1944


I completed my BE EEE degree 2006 .... which license should i apply .... ?????

1778


How Diesel Generator start ?

2474


How cmd is calculated in case of energy neters

1998


RATING OF LIGHTENING ARRESTER FOR 11 KV LINE IS 9 KV is ok ,but haw to calculate the KA rating?

2137


tan delta equation test on alternators

2263


If the earth is a good conductor of electricity, why don't people get shocked every time they walking on earth?

1899


Basic motor transformer generator

1544


What is meant by time harmonics and space harmonics?

2854


what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.

1580


in power generator normaly voltagr betwween esth to neutral is 0 but my work place generator show the volatge is 60v any body know why? thanks