Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What type of tranformer generaly at soft wares like
capacity 2000 kva 1800 kva etc iam confused it CT or PT
OR distribution tranformer

Answer Posted / ankit

Actually you are confused in the ratings:
A CT i.e. current transformer is used as an instrument
transformer to measure current.

And Similarly PT i.e. Potential Transformer is used for
voltage measurement.

The ratings specified by u are the nominal ratings of a big
building like Mall, IT park so the transformer is A
DISTRIBUTION X-MER which is used for meeting the load
requirements of that premise.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

bus bar design conditions and sizing pls tell me quickly

1891


What is the classification of hydro projects based on installed capacity?

1181


what is the control circuit for operating the clean room air shower

2254


What do you mean by an instrument transformer?

1072


Why collecting electrode of ESP to be earthed

2136


what is the usage of microcontroller in the panel board?

2080


Why corona leads to production of Ozone and glow of the color VOILET?

1964


What is the current carrying capacity of 35sq.mm flexible cable?

1454


i need list of swg(standard wire guage) or area of conductor v/s current carrying capacity of conductor copper & alluminium...

1814


How to justify this statement ??? "Capacitors in series provide less capacitance but higher voltage breakdown rating for the combination"

1870


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1778


What does the letter CTNM in negative phase sequence relay means?

1811


how indusrial diesel generator work

1909


what is earth fault relay 64T, why it is used in main Incomer and neutral CT of Transformer.

3785


what is the physical connection of a analog i/p to a analog i/p module (ab plc)and through a analog o/p module(ab plc) to a analog o/p . and how all the process control by scada

1917