What type of tranformer generaly at soft wares like
capacity 2000 kva 1800 kva etc iam confused it CT or PT
OR distribution tranformer
Answer Posted / ankit
Actually you are confused in the ratings:
A CT i.e. current transformer is used as an instrument
transformer to measure current.
And Similarly PT i.e. Potential Transformer is used for
voltage measurement.
The ratings specified by u are the nominal ratings of a big
building like Mall, IT park so the transformer is A
DISTRIBUTION X-MER which is used for meeting the load
requirements of that premise.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.
Why efficiency in thermal power plant is low?
hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .
why 15 kw motor winding resistance is low then 5 kw motor winding resistance?
hi if anybody got model questions for cpcl Grade'A' electrical engineer position.send it to my mail please krishkumar22@gmail.com
what is meant by neutral compensation factor and where it is used
What is the effect on Power factor and capacitor when your company load is more than 70 % of welding transformer
If short circuit ratio is high is it bad or good for a machine then tell the reason...
how to compare with Relay settings for HT< panels, RMU panel, and PSS CSS transformer?? 1) Load amps, 2)Tripping time, 3) CT ratio, 4)Cable size 5) Transformer KVA rating 6) transformer full load amps
Can the output voltage of a rectifier be greater than the input AC voltage without the use of any voltage multiplier in the circuit??please provide the explanation too..
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?
Why Neutral Isolation is required?
How you will determine the volume of oil in a particular Distribution transformer.