Answer Posted / nancy
NEW--> when the tester find the error or mistakes in the
application
ASSIGNED-->It will be assigned to the developer who
developed the application
FIXED--> The status of the bug will as fixed after it fixed
by the developer
VERIFY--> It should be verified by the tester once it fixed
and it will be REOPENED only if the bug remains the same or
else
CLOSED--> It will be closed
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is an entry criteria?
How do you know the code has met specifications?
Enlist some bug status along with its description?
I have to give weights to 5 stones so that using a simple balance and the stone i should be able to weight any number between 1-100
what is sanity test (or) build test?
When will the testing starts?
What are the benefits of requirement traceability?
What is severity and priority of bug? Give some example.
online demo for bug tracker tool(let me know the website)
Can you do system testing at any stage of sdlc?
1.What is configuration Management? 2. Explain Impact Analysis 3. Explain Peer Review 4. what i kickoff phase of Formal Review. 5. Whatv are the phases of fundamental test process. 6. what is state transition testing. 7. what is LCSAJ 8. Test conditions are derived from where?
Who are all involved in an inspection meeting?
What is an inspection in software testing?
What is the big deal about ‘requirements’?
When new application ready to test than whats your testing strategies?