Why not implimenting power factor in Diesel generator
Answer Posted / bhupal singh
Power Factor is the property of load. Generator is a source
of power. So it can not be corrected thru generator. However
Synchronous generators can regulate power factor by
adjusting it's excitation current.
| Is This Answer Correct ? | 4 Yes | 6 No |
Post New Answer View All Answers
why Lightning arrestor are made by 2 seperate stack of inslutor but why cvt are in single stack of insulator.
The transmission does not have options: a)Partition noise b) Flicker noise c) resistance d) Short noise and reason
advantage and disadvantage of team work?
sir i have cleared the apti test of EIL held on 15th march and my interview will be in new delhi on 2nd june.i will be very much helpful if u help me regarding the type of interview questions comes at EIL.(URGENT.........PLZZZZZZZZZZ...............)
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
iam using DM 3251 voltmeter(1 percent accuracy)for 11KV system PT ratio is 11KV/110V.can anybody explain what is the max and min voltage deviation.
What will be the voltage impact on secondary side of two transformers with different vector groups when both voltages are compared.
how calculate the electrical load for industry and office
WHY IL=IPH IN STAR AND WHY IPH=IL/1.732 IN DELTA? WHAT IS REASON BEHIND IT?
write a program that prints prime numbers from 1-20 in digonal form
What happen Grid EARTH plat got cut.
I need bhel electrical test pattern & paper
i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected
What is inverse definite minimum time lag relay? Where is it use?
What are Contactors? How they works and what its highest rating?