Answer Posted / manjunath
Hi,
P ls Check find the answer ......
It is the Greatest demand of load on the power station
during a given period. it sometimes also called as "system
peak" It is called maximum demand.
Sent By
manjunath And Rajshekar
| Is This Answer Correct ? | 29 Yes | 3 No |
Post New Answer View All Answers
The simple way of finding the leakage quantity and % in compressed air distribution system
What is dynamo function in DG sets and draw block diagram?
anyone knows service engineer in chennai for EDM SPARKING MACHINE.CHMER PULSE CD 60 M.pL GIVE ANY CONTACT NOS
The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.
how the CT and PT is connected in the circuit during testing of transformer explain with diagram
How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....
In what cases (circumstances)we should apply P controller, PD controller, PI controller & PID controller ?
how to design coil turns ?
Iwould like to know barc interview questions
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
what is sevice settings for mccb?How can be it setted?
what is cogging and crawling
how braking & making capacity of circuit breaker are calculated?
Explain the fundamental difference between emf (electro motive force) and pd (potential difference) ?