Answer Posted / manjunath
Hi,
P ls Check find the answer ......
It is the Greatest demand of load on the power station
during a given period. it sometimes also called as "system
peak" It is called maximum demand.
Sent By
manjunath And Rajshekar
| Is This Answer Correct ? | 29 Yes | 3 No |
Post New Answer View All Answers
why Lightening Arrester Probe sharp at Top of telecom tower.
What are Contactors? How they works and what its highest rating?
critically criticize the application of ring main unit in power system
Compare salient pole and cylindrical rotor machines.
nwhat are the main Components of servo motor?
How much should be the load percentage for 15kva Inverter and Iinut & I output load with Calculations
sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.
what happen if the load connected to the induction motor is taken away? the same question for synchoronous generator in synch i think that the the exitation voltage will appear on the terminal only if so plz answer me
how to conduct dc resistance test for rotor of an alternator and how to measure the rotor dc resistance value theoritically?
trasnfarmaer core make
Whats the minimum value for I.R. that can be allowed for HT & LT alternators for operation?
What is the equivalent circuit of a transformer and its vector diagram?
How is efficiency of DG set calculated? At many places I found the efficiency to be mentioned in percentage. But at some other places I found kWH/ litres. I want to know how dimensionless percentage value is arrived at?
How do you compute voltage drop and cable size over distance?
What are differences between Voltage, EMF & Potential difference ?