what are the affects of loose connection in electrical
circuit.
Answer Posted / er.s.kant.
less current and spark. on heavy load it may burnt.
| Is This Answer Correct ? | 41 Yes | 16 No |
Post New Answer View All Answers
i have gear oil pump with single phase motor.some time its motor starts running in reverse direction rather than forward direction...whats the reason behind this issue. 1- either capacitor is week? 2- or winding is week?
Working of microwave oven?
why we take movement of rotor always in counter-clockwise direction in 3-phase induction motors?
How can we checked Killo Watts of Motor & Alternator?
describe the fully control circuit diagram of ac drives
how to calculate kvar in Akiva
WHat is the general checks required for Dry type transformers
how to measure the current by compact digital equipment with dislay which fit inside any equipment
what is 30-phase of transformer
why the arc welding machines require parallel earthing systems? ie why each machines are connected to earth pit by separate wires during earthing? wats it adavantages?
generally in LT and MV motors we are using 3.5Coresx16,25,35,50 etc cable for supply.although motors is earthed at two point and having all protection.then why we are using that 1/2 core for earthing the motors.while in HT cable we are using only 3core cable for motor supply.generally lt and mv motors are delta connected and ht motors having star connection.whethere it is having any relation with winding connection( star or delta).all motors i am talking about are dol only.can anybody solve my confusion.thanks...
If I want to lift the water at a height 50m from ground level through two inch(diameter) metal pipe then what is the capacity of motor pump is required? is it possible in single phase supply or not?
Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?
Diagram on interconnectivity of 11kv transformer with RMU (i.e, one incoming and two outgoing or two incoming and one outgoing)
What is the minimum underground tank size capacity considered for firefighting purpose?