I Recently faced the interview in SAP SD.Interviewer asked
the what is the serial no in delivery processing?and also
what is the pgi?and what is the configuration for packing?
and what is the relation between plant and shipping point?
Answer Posted / bapu
PGI means Post goods issue i,e; inventory was reduced & the
material are ready for transportation.
after PGI material document will generated as well as
financial document also generated. Value of the stock
reduced & sold material value will increase.
Foe packing, material should be packing relevant.
In material master packing material gr should maintain.
packing material should be created & stock should be
initialize. Material type should be VERP & item category
will be LEIH.
in VL01n after picking & before pGI we have to pack the
material by clicking the packing icon
Plant & shipping point relationship is many to many
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
What is a partner type? Give some example?
how text is determined in Invoice,What are tools used in To_be study
Gather Information For better understanding &analyze cases received through LNOB for pirs &ccrs
Intercompany sales I am working on intercompany sales. How do I create material in both company codes?
Dear Experts, I want to know the particular customers consignment delivery documents only not other than that i do not want the normal delivery how can we get only the consignment stock of delivery docs created for the customer.
what is purpose of maintaining common distribution channels and common division??????
Is it possible to perform an availability check based on the plant yet exclude one storage location?
Have you worked on interfaces? what are the?
how to configure Supply chain management
What is open and close posting periods?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration?.
What is the structure of delivery document?
Where do you assign text determination procedures for customer master records and for documents?
What is the difference between make-to-order production with and without assembly processing?
Is there an user exit to copy the data into planning table?