why we generally use 3.5 core cable or in other word 1/2
core for neutral and also confirm me that in balance
conditiob(3 phase)current in neutral will zero
Answer Posted / blake australia
Any switch mode power supply (computer, UPS, AC/DC
transformer) has some leakage current and imbalance. In
data centres they are starting to use full size neutral
cables to account for this. Basically only need 1/2 size in
motors, saves money on expensive copper
| Is This Answer Correct ? | 5 Yes | 36 No |
Post New Answer View All Answers
What is the difference between the relay and the circuit breaker?
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
How out of step protection relay works?
How to decide whether A / B / C / D curve type MCB should be used?
IF HT CAPACITOR IN ON POSITION IS THERE ANY LOSSES I.S I SQURE OCCURS IN THE SYSTEM
Why line VTG = √3 phase VTG in star? How?
How 3 phase invertor works?
Any Electrical Engineering jobs?Please refer for interviews. Thank you
what is the constructional difference between a power transformer and potentian transformer?
What is the function of retrip in busbar?
difference bewteen reverse current and alternating current
Why corona leads to production of Ozone and glow of the color VOILET?
Single phase and threephase power calculation
why capacitance effect is predominant in underground cable transmission and inductance effect is predominant in over head line transmission?
what will be project cost for 100 kv transformer connection under oyt scheme.