kalyan


{ City } hyderabad
< Country > india
* Profession * test engineer
User No # 3326
Total Questions Posted # 0
Total Answers Posted # 8

Total Answers Posted for My Questions # 0
Total Views for My Questions # 0

Users Marked my Answers as Correct # 7
Users Marked my Answers as Wrong # 9
Questions / { kalyan }
Questions Answers Category Views Company eMail




Answers / { kalyan }

Question { 12431 }

what is walkthrough?


Answer

Business Analysts complete the requirement document, they
call a meeting to explain how the functionalities work,
what the process is in the designed application and other
details. The participant members in the meeting may
provide feed back and various point of views are
expressed. This is walkthrough meeting.

Is This Answer Correct ?    2 Yes 0 No

Question { MBT, 32863 }

Describe Software Testing life cycle? What are the steps in
volved in STLC (Software Testing Life Cycle)?


Answer

Software TestLife Cycle shows a structure

1. system study
2. scope\approach\estimation
3. Test Plan Design
4. Test Case Design
5. Test Case Review
6. Test Case Execution
7. Defect Reporting
8. Gap Analysis
9. Summary Report

Is This Answer Correct ?    2 Yes 3 No


Question { Cognizant, 37173 }

what is difference between severity and priority?
what is difference between bug and defect?


Answer

Severity : It Means how depth it is effecting the
application.
Priority : How fast it should be resolved to avoid the
defect.

Is This Answer Correct ?    0 Yes 1 No

Question { Accenture, 13214 }

In which stage more defects found means
anlaysis,design,coding,testing and maintance?


Answer

Testing is main stage for finding Bugs.

Is This Answer Correct ?    0 Yes 0 No

Question { Oracle, 9527 }

How we load the test script into testdirector


Answer

hi,

Here we have an option like ADD-INS in TestDirector.

By connecting Win Runner Add In to the Tesdirector we can
load the test scripts.


step 1:create test scripts in WR as usual.
step 2:Now we are trying to save it in testdirector.
Tools-->test director connection-->same URL
(TD)..connect...close
conn between WR & TD
File--save--save test to TDProject
then save GUI
save--gui map editor...save gui file to TD project

Is This Answer Correct ?    1 Yes 0 No

Question { InfoStep, 14926 }

can you plz tell me the all documents to be completed by a
manual tester?


Answer

Documents prepared by Tester is


1.Test Case Document
2.RTM Doceument
3.Defect Reporting Document
4.Summary Document

Is This Answer Correct ?    1 Yes 0 No

Question { CTS, 13432 }

which test case format ur company following


Answer

hi to all,


In our company we are following format

1.Testcase ID
2.Type of Testcase
3.Testcase Description
4.Expected Results
5.Status

Is This Answer Correct ?    0 Yes 5 No

Question { IBM, 8958 }

what is framework? which frame work u follow for writting
script?


Answer

hi kumar,

Your explanation is good.
In the same way i need some help from u technically.

Is This Answer Correct ?    1 Yes 0 No