If 100 KAV USP dedicated earth got disconnect / Cut. What will happen at load.
Electrical Engineering 1896
Question { 2566 }
What type of changeover switch needed to run a load of five 1.5 tonn ACs.
Answer
| Is This Answer Correct ? | 0 Yes | 0 No |
Question { 2508 }
How many battery required for an 3kva online ups with 3 hrs back up with usage of 3 fans,3tube lights
Answer
| Is This Answer Correct ? | 0 Yes | 0 No |