When is a 'no action' group used ?
What are the maximum/minimum of threads available for incoming http ?
How do wait-notify resources work ?
What are the revision control system options available in tibco designer?
What activities are supported in xa transaction ?
What are the cases where business process cant proceed correctly subsequent to restart from a checkpoint ?
What are the modes of tibco bw installations ?
What are the mandatory configuration parameters for ftp connection & ftp with firewall ?
Process engines in a fault tolerant group can be configured as peers or master secondary.how do these differ ?
Which activity is used for detecting duplicate message processing?
How to control the sequence of execution of process instances created by a process starter ?
What are the different modes of service invocation?
Explain the process configuration parameters - max jobs, flow limit & activation limit ?
Which mechanism can be used to pass data between a process instance and a called sub process other than mapping from/to the callee's input/output ?
What is tibco?