Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1960The Horse bought rs. 2000 on Jan.20th died, its carcase was sold for rs.50 loss rs. 1950 what is journal enty
1824User registration form so many details will be there to enter like Username,Phone No,Email id ect.how do we write test cases for that? in one textbox i have to write all the test cases and go to next textbox
1613Are There Additional Documents And Other Requirements In A Chapter 13 Case? What Is Required In The Chapter 13 Plan?
980
I am fresher and i have completed my software testing course and i don't have real time experience,can anybody help me regarding financial domain projects,main testcases in that domain.
I am surekha new commer for this site? I have some doubt's pls clarify it..... I finished my B.tech and S/w Testing Course Now iam searching for a job in Testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,Matrix for Banking,ERP Projects etc.Here is my email id surekhai@yahoo.com
What is the content reside in Use case Document?
have u write any sanity testcases?
what r the strategies & methodologies r u following in preperation of test cases based on usecase?
The Following Characterstics posses some XYZ company. * Uses formal standards and policies * Conducts software inspections * Has advanced configuration management and change control * Uses CASE tools * Has a software engineering process group * Gathers metrics on process and quality * Requires that developers have formal software engineering training * Practices continued process improvement Based on aboue , Tell me which CMM Level is the company..? 1. Level 1 - Initial 2. Level 2 - Repeatable 3. Level 3 - Defined 4. Level 4 - Managed 5. Level 5 - Optimizing
Many times,civil cases result in compromise and settlement agreements. When was the last time you successfully negotiated your stance?
This post does not have a normal trial docket. You will be assigned to cases where the defendant's crime occurred in your patrol division. How do you feel about not being in the normal trial rotation?
what are the control measures in case ofsclerotinia stem rot of soyabean?
Write a function that inserts an integer into a linked list in ascending order. Write the test cases for this function.
Can the activities of test case design be automated?
How are the activation URLs different in case of SAO and CAO in .NET remoting?
How does dynamic discovery (in case of *.vsdisco) work? What goes on behind the scenes?
Our software designers use UML for modeling applications. Based on their use cases, we would like to plan a test strategy. Do you agree with this approach or would this mean more effort for the testers.
I know functional test cases are derived from frs and system design specs. But are test cases for performance, database, boundary, relational integrity and other types of tests other than functional tests created from frs and system design specs as well? When are these test cases created? Are they in the same test plans alongside functional test cases or is their a different test plan that includes these test cases?