Are there characteristics of a system that cannot be
established during system engineering activities? Describe
the characteristics, if any, and explain why a
consideration of them must be delayed until later
engineering steps.
Answer / ketan korat
When putting a system together, the different components
interacting may show unexpected behaviors. It is hard to be
able to predict these completely.
A typical example happens in power plants when running steam
boilers or power generators in parallel. The load is not
distributed evenly, as would happen on a stand alone unit,
but needs to be constantly tweaked.
In addition, there are unexpected configurations resulting
from the installation itself, which create unstable modes
due to interaction. These must be addressed and proper
compensation through the control system be applied,
Is This Answer Correct ? | 1 Yes | 0 No |
Hi Friends... I faced an question in Tcs.But i unable to answer. find the question below.. A root filesytem"c0t0d0s0" caries 100 gb data. in this filesystem. i am having 3 files named a,b,c it caries 20 gb data each. I need to take backup only 3 files a,b,c. How i can take. Note you need to take only 3 files to an single tape having capacity 80 gb. Whats the commad used?
Are there characteristics of a system that cannot be established during system engineering activities? Describe the characteristics, if any, and explain why a consideration of them must be delayed until later engineering steps.
What are the main risk factors which may be encountered in the development of software?
what is the difference between testing and quality analysis
How would you do an Estimation?
how to calculate defect density rate and what are the retrospective mesures you have experienced / taken to reduce the same
which electronic company offered industrial visit in chennai?
How does agile communication differ from tradition software engineering communication? How it is similar?
brief about the methodologies to evaluate weightage of test cases and what are the basic parameters to be considered
is QA expects any level of interaction from development engineer !!!
What are the beta test and alpha test?
DIfference between ISO and CMM level
2 Answers CarrizalSoft Technologies, Polaris, TCS,