what is the difference between prototype and spiral model?
Answers were Sorted based on User's Feedback
1.Spiral model is called a meta model.Spiral model is made
with the features of Prototype model and Waterfall model.
2.Spiral model takes special care about Risk Analysis.
Whreas it is not given importance in Prototype model.
| Is This Answer Correct ? | 137 Yes | 36 No |
Answer / ranjan deo
Prototype model is suitable when the requirement of the
clent is not clear and it is supposed to be changed.
It doesn,t cover any risk management.
While Spiral model is an enhancement of the prototyping
model with so many extra features.Spiral model has the
facility of risk analysis and many more.
| Is This Answer Correct ? | 95 Yes | 25 No |
Answer / niks
protoytyping model is the overview of the system wherease
spiral model comes with extra feature called risk analysis.
| Is This Answer Correct ? | 34 Yes | 9 No |
Answer / asha
the spiral model can be adapt to apply throughout the
life of computer software.
while prototype model that end when software is delivered.
after software deliver is not responsible for any problem of
software.
| Is This Answer Correct ? | 35 Yes | 13 No |
Answer / sunil kumar yadav
1.In spiral model risk is very high
while in prototype model risk is low.
2. Spiral model is used when requirement is not clear and needs conformation
while in prototype model requirement is clear but complex.
3. In spiral model customer interaction continous to move togather.
in other hand prototype model customer interaction needs till the prototype is approved.
| Is This Answer Correct ? | 56 Yes | 38 No |
Answer / neha reddy
The spiral model is a risk-driven process model generator for software projects. Based on the unique risk patterns of a given project, the spiral model guides a team to adopt elements of one or more process models, such as incremental, waterfall, or evolutionary prototyping.
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / sehri
spiral model consists of prototype at every phase
| Is This Answer Correct ? | 20 Yes | 28 No |
I have an Interview about Guidewire claimcenter,I need some kind of screenshots or claimcenter visuals with or with out the information in it.I would really appreciate any kind of help- email at gy_rk2003@yahoo.com
Give me an e.g. of Low Severiority and low priority?
what are the most frequent requirement tracking and management tools available
what did u do in the sap sd project ?how did u maping your client business?plz i need help....
how to manage the requirement if it is included after Requirement specifications phase
in your organization in what way(phases) s/w is developed and in what way testing will be conducted?
Which company made 'Office Hindi' softwear?
what are the basic check points before completing the specific requirement for implementation
what happens if we didnt close cursor in a cobol/db2 program
what is the difference between prototype and spiral model?
7 Answers Hazara University, TCS,
what is the purpose of SDLC?
Guidewire