Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I Want Andhra bank clearkal aptitude questions


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More General Aptitude Interview Questions

the program requires 4000(n)1/2 [ie square root of n].if size of program was increased by 1% then calculate the percentage change in size of program.

0 Answers   Accenture,


a man has some hens and cows. If the number of heads be 48 and the number of feet equals 140, then the number of hens will be?

0 Answers  


A certain type of mixture is prepared by mixing brand A at Rs.9 a kg. with brand B at Rs.4 a kg. If the mixture is worth Rs.7 a kg., how many kgs. brand A are needed to make 40kgs. of the mixture?

0 Answers   Wipro,


There are two natural numbers. A cube difference of the squares is a square difference of their cubes.These are the smallest possible numbers. what is the sum of these numbers?

0 Answers   HDFC,


Find the next letter in the series O,T,T,F,F,S,S--

0 Answers   DSQ Software,


hi i am going to write SBI Technical Executives entrance exam.pls help me out in clearing thisexam.kindly proivde me the question papers..

0 Answers  


(a)A square is to circle as cube is to (b)Success is to failure as joy is to

2 Answers   Geometric Software,


A contract is to paint 3 houses. Mr brown takes 6 days to paint a house. Mr black takes 8 days and Mr blue 12 days. Mr brown leaves for a vacation after 8 days. Mr black works for 6 days from then.How many days would Mr blue require to complete the contract?

5 Answers   3i Infotech, HealthAsyst,


Dear Sir/ Madam, Kindly send me the model question answers for RRB-Technician Signal(Physics/Maths) to saranya67veena@gmail.com

0 Answers   RRB,


When two unbiased dice are tossed simultaneously, the numbers that appear on the top surface of the two dice are a and b.What is the probability that a^b is a perfect square? (a^b=a to the power of b)

4 Answers   TCS,


What is the difference between control module

0 Answers   Global Alarms,


Two trains are traveling in 60 kmph on same trace, towards each other. When the distance between them is 18 km, a fly is going to start, flying between them in 80 kmph speed. Find the traveling path distance of the fly upto when it is going to crush by the 2 trains?

0 Answers   Accenture,


Categories