how many types of formats you can run a report using cognos?
Answers were Sorted based on User's Feedback
Answer / ksin
hi,
u can run a report in 6 format.
ie;1. HTML
2.PDF
3.EXCEL 2000
4.excel 2002
5.DELIMITED TEXT
6.XML
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / sarma
1. HTML
2. PDF
3. EXCEL 2000
4. excel 2002
5. excel 2000 single sheet
6. DELIMITED TEXT (CSV)
7. XML
| Is This Answer Correct ? | 7 Yes | 0 No |
There are generally 7 types of report formats we can use to
run the report
1. HTML
2. PDF
3. Excel 2007
4. Excel 2002
5. Excel 2000 (single sheet)
6. CSV
7. XML
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / arkchowdary
---------------------- We have ----------------------------
HTML Format,
PDF Format,
Excel Format(2000 Format,2002),
XML Format,
Word Format,
| Is This Answer Correct ? | 0 Yes | 6 No |
Where do i get Free COGNOS 8 Certification Dumps Downloaded for these codes COG-105, COG-112, COG-122, COG-125, COG-132, COG-135, COG- 142, COG-145, COG-180, COG-200, COG-205, COG-300, COG-310, COG-400, COG-480
17. How can we display tabs in the report Footer (Ex; PAGE 1 2 3 4 5...last)?
I want to schedule the report as sysdate-1.....how to do
In a Single page we are having 3 list. While running each has to populated in separate page?
What is Bitmap Index?
What is main advantage datawarehousing over oracle?
What is the use of powerplay web viewer in cognos?
How to schedule the report twice in a day?
If we are migrating lower version of Cognos reports (e.g. from Ver 7.0 to Cognos 8) then how we migrate Impromptu Catalog (ver 7.0) in Cognos 8? Do we create FM model for that? Please explain.
I have two date promts which optional. by defalt it will be checked.i want to unchek that date prompts.How to uncheck the date prompts in cognos
WHAT STEPS SHOULD BE TAKEN BY A REPORT DEVELOPER TO INTERACT WITH THE CLIENT SERVER?
if u having 2 pakages i want a report with report items in 2 pakages how to use the 2 pakages in single report please ans me............