Informatica server and client are in different machines. You
run the session from the server manager by specifying the
source and target databases. It displays error . You are
confident that everything is correct. Then why it is
displaying the error?
No Answer is Posted For this Question
Be the First to Post Answer
explain about your project architecture in ssis..could u please send to my mail..vinod.kjvk@gmail.com
Can anyone please send me the latest informatica dumps (power center 8.1.1) for all the three exams? My mail id is yokilamai@gmail.com
Assume u have a 24CPU machine with 24GB RAM, suggest how u would like to configure Informatica ,like number of concurrent sessions, RAM requirements etc,max partitions that u would permit per mapping.
What is tracing level?
How can we handle Rejection Logic in Source tables while we are matching the data in Target side in ETL Testing ?
what are the concerns of OLTP and DSS systems?
what are the reports developed in sap bw project and what is the requirement for developing it?
what is the advantage of persistent cache? when it should be used?
how to join two tables without using joiner transformation .advantages of joiner over lookup and vice versa.
Hi please try to reply with answer. my mail id is raghu.1028@gmail.com. if the source is having millions of records, but having theree target tables. As per user the first record need to insert into first target and second record in to a second target and third into third target, similarly the process needs to repeat?
please tell me any easy ways of testing the Data warehouse project. In my project we are not using any tools for ETL. we are writing scripts in SCRIPTELLA. And we using Pentaho tool for Reporting How can i test all these. please tell me ASAP. thanks in adavance
What are the etl testing operations includes?