How many types of scripts generated in Load Runner?
Answers were Sorted based on User's Feedback
LR uses standard ANSI C language for scripting. However, it supports many types of scripting based on the protocols that coming under load test like java,sap,siebel,.net,etc. So there is no standard answer for this question.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nayeem
gui,database,sap,java....etc
correct me if I am wrong
Is This Answer Correct ? | 1 Yes | 3 No |
Weblogic performance parameters, Oracle database performance parameters
How many components are there in Loadrunner and what are they?
Hi all, In Monitoring, if u want to know0 how much disk space the app has taken to deploy? Plz help me.
Hi i have installed LR 8.0v on my system and wanted to test siebel web application. when i tried to record the application throught siebel web protocol, the launcher tries to connect to that URL but after some time the URL gives as Page Cannot Be Displayed, the same URL when we login manually it works fine. LR is not able to connect to the Application. What could be the reason?
In a web server, database and network are all working fine and now, where could be the problem?
What is vuser-init section?
What is local configuration file?
What are the information crating for each host?
What do I need to know to do load testing in addition to knowing how to use the loadrunner tool?
)What r pre settings while recording a script?
When loadrunner is used?
How can u use the configuration management tool like Quality Center in ur project?For what purpose it is being used?