What is TRAP in Framework manager?What's the use of TRAP?
Where We are using this?
Answers were Sorted based on User's Feedback
Answer / humayun
Trap is nothing but finding the relationships for
refinement.traps are of two levels
1.data traps(this are again 4 types
chasm,connectivity,fan,transitive)
2.reporting traps(are occurred due to 1.reference of facts
with no dimensional context 2.due to ambiguous joins)
| Is This Answer Correct ? | 24 Yes | 0 No |
Answer / jagannadan
TRAP ITS USEING FRAME WORK MANAGER TRAP ITS ONE OF THE JOIN
U SEE EDIT JOIN LOOP IT WILL USEING JOINING PART
| Is This Answer Correct ? | 2 Yes | 11 No |
How is possible this scenario using in type-in prompt.?
Hi, I Want To Display The Report. From MOnday To Friday By Using Date Prompt.PLs Expain To Me...
is it possible to display the column names in first page but not in remaining pages i.e if a report contains 10 pages column names should be displayed in 1st page but not remaining pages ( 2 to 10)
difference between stored procedure and function?
What is model filter and query filter?
how many notations are posible(cordinolity)are there in between two tables(one is fact and another is dimension)pls give me a example pls.
I have created a database "TestingDB" in MS SQL Server 2005. I have set the port properties and the Cognos Service is up. But I don't see anything in the Cognos. In the administration i have set the ODBC connection and it tested successfully.If i copy the samples to the appropriate directory then i can see the samples.But I don't know how to do the same thing with my own database "TestingDB". As i have configure the cognos in my company which is having a database (very near to production database).I am a novice in cognos. Please help me out.
Interval Prompt's Usage? Example for usage in Project
please please give me some banking calculations in framework manager.
Due Date (Highlight Issues in Blue where Due Dates are less than Todays Date),I have only Due Date column then how to over come the problem.How to find out which Due Date are less than Today Date...Kindly provide the detail steps to my mail ID-->asimcognos10@gmail.com
What is slowely changing dimensions?why we are used SCD?
What are all types of prompt?