What is a key field in an IMS database?
Answers were Sorted based on User's Feedback
Answer / deepak
Key field - used to uniquely identify the records in the
segment
Is This Answer Correct ? | 15 Yes | 4 No |
Answer / bharathi
A Key field in IMS DB of a segment is a field or group of fields which assist in sorting the segment occurrences in ascending order.
This key field is not necessarily to be unique.
Is This Answer Correct ? | 6 Yes | 3 No |
Answer / nagesh
DL/I to maintain segment in Ascending order other than key sequence.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / s
Key field and sequence field are synonymous. It is used to
access a specific root segment and hence a specific
database record.
Is This Answer Correct ? | 1 Yes | 8 No |
What are the ways to mapping external control block? a. ENTRY b. PROCEDURE DIVISION USING c. CALL ‘DLITCBL’ d. ALL ABOVE e. A & B
What is a Root?
What are the retrieval sequences in ims db?
Is it necessary that the key field in a Dl/I database be unique?
What are the objectives of dbms in ims?
Explain the maximum number of segment types allowed for a single database?
How do you write a PSB code ?
What is the difference between HDAM & HIDAM DB types and when would you use each?
What for procopt is used? List some of them?
how do you bind the cobol with db2
Explain psbgen process?
how to create a changeman read only audit and update only audit Specifications for the Read only Audit 1) Read HFFD database unqualified. 2) Read FDRT, FDDM, FDAP segments. If FDAP-APP-STS is ‘2’ read the FDAV segment and get the FDAV segment which has FDAV-APV-OPTION as ‘X’ If FDAP-APP-STS is ‘5’ read the HFAC database. Read the ACRT segment qualified based on the key obtained from the FDAP segment from HFFD database. Conditions for writing into output file: a. App Type should be NEWR b. App Status should be 1, 2 & 5. c. Write 50 records per app status. For e.g. first 50 records for App status 1, 2 & 5 each The output file should contain the following fields from the database FDRT-COMP-CTRY-CODE X(03). FDRT-CUST-ID-NUM X(10) FDDM-DEM-SEQ-NUM X(01) FDAP-APP-SEQ X(02) FDAP-JNT-IND X(01) FDAP-APP-STS X(01) FDAV-APV-OPTION X(01) FDAV-APV-DT X(06) FDAV-APV-AMT X(07) ACRT-ACCT-NUM X(06) ACRT-SEG-BUS-TYPE X(02) ACRT-NM1-LAST X(19) ACRT-NM1-SS X(09) ACRT-NM1-1ST X(12) ACRT-NM1-INIT X(01) ACRT-NM1-SFX X(03) ACRT-NM1-TITLE X(02) PSB – DVAN2BMP In case you get a GE for any of the conditions, write to output file along with the details of the database segment which was not found. We need to complete this whole process by tomorrow. Run the audit in DLI mode. 2) Sort the output file created in step 1 on Cust ID, Dem Seq & App Seq. Specifications for the Update Audit 3) Take the output of step 2 as input for an update audit. Details are as follows: Read each record & check the app status. If app status is less than 2 then update the FDAP-NEW- MONEY-ENT to $25000.00 PSB - AUDBMPJ The job would be a BMP job. The test job would be run in IMSE region. Note - The proc (which will be called by the job) and the job should also be present in the change-man package itself. You’ll have a test job in your PDS along with overrides to execute the program in test regions. The job would be a DLI job. The test job would be run in IMSE region. It’ll have the following steps. 1) Delete-define output and error files. 2) Use a copybook for the output layout.