From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM
the rain increased to fall at a rate of 1.25 in. every two
hours. How many inches of rain landed on the ground by 5:00 PM?

Answers were Sorted based on User's Feedback



From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / sidharth

6 inches

Is This Answer Correct ?    53 Yes 6 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / guest

6 INCHES

Is This Answer Correct ?    22 Yes 4 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / aarti

6 inches....
before 11 am 2.25(given)
after 11 am
11 to 1=1.25
1 to 3=1.25
3 to 5=1.25

total=(1.25)*3+2.25=6

Is This Answer Correct ?    13 Yes 1 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / guest

6 inches

Is This Answer Correct ?    4 Yes 1 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / suriya

6 inches.

Is This Answer Correct ?    1 Yes 0 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / priya

6 Inches

Is This Answer Correct ?    0 Yes 1 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / zakriya

9.75

Is This Answer Correct ?    2 Yes 6 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / shiva

7-11 = 2.25inches

11-01 = 3.50inches

01-03 = 4.75inches

03-05 = 6.00inches

05-07 = 7.25inches

so answer s from 5 pm 7.25 s answers

Is This Answer Correct ?    13 Yes 20 No

From 7:00 AM to 11:00 AM it rained 2.25 inches. At 11:00 AM the rain increased to fall at a rate of..

Answer / sabeel rahman

at one houre _2.25/4 inch

from 11am to 5.00pm 6*2.25/4inch

rate increse from 11am to 5.00pm =3*1.25inches

sothe totel rain landed =6*2.25/4=3*1.25=2.25=9.37

Is This Answer Correct ?    2 Yes 11 No

Post New Answer

More General Aptitude Interview Questions

how to calculate three digit number multiplication? send me any shortcut? 235*235

1 Answers   Banking, UBA,


find missing no 15 13 12 12 11 11 ?

8 Answers   HCL,


how can i improve myself in solving apptitude questions, guide and help me with some kind of tips.suggest me books too.so that i can get betterment in solving apps

0 Answers   Valtech,


25% of 12% of 4% of 1000 is ?

7 Answers   ACC, Franklin Templeton,


A certain type of mixture is prepared by mixing brand A at Rs.9 a kg. with brand B at Rs.4 a kg. If the mixture is worth Rs.7 a kg., how many kgs. brand A are needed to make 40kgs. of the mixture?

0 Answers   Wipro,






A long thin strip of width 7cm is kept on a flat surface. Another identical strip is kept on it in an overlapping manner such that the combined width of the two is 11 cm. What is the width of 55 such strips kept like this?

4 Answers   TCS, YS,


Area of triangle=(1/2)*b*h base increased by 4 times & height is divided by 2, the net effect of area?

0 Answers   Wipro,


A car is traveling at a uniform speed. The driver sees a milestone showing a 2-digit number. After traveling for an hour the driver sees another milestone with the same digits in reverse order. After another hour the driver sees another milestone containing the same two digits. What is the average speed of the driver.

0 Answers   Infosys,


A,B,C,D,E are some numbers.if AB * CD = EEE and CD - A =CC THEN what is AB * D =? IN SAME CODE .

0 Answers   Infosys,


Two computers each produced 48000 public utility bills in a day. One computer printed bills at the rate of 9600 an hour and the other at the rate of 7800 an hour. When the first computer finished its run, how many bills did the other computer still have to print?

2 Answers   Cap Gemini, TCS,


In a mixture, R is 2 parts and S is 1 part. In order to make S to 25% of the mixture, how much of R is to be added? explain how can i solve it??

4 Answers   Deloitte, TCS,


if a car starts from A towards B with some velocity due to some problem in the engine afetr travelling 30 km .if the car goes 4/5 th of its of actual velociteythe car reaches B 45 min later to the actual time.if the car engine fails after travelling 45km the car reaches the destination B 36min late to the actual time ,wat is the initial velocity of car and what is the distance between A and B on km.

3 Answers   IBM, Oracle, TCS,


Categories